![]() Preferred variant: Canal and foreshore bridge According to the expert opinion, the target load level could only be achieved by a new replacement structure. A structural analysis showed that the bridge does not have sufficient load-bearing capacity in the longitudinal and transverse directions. This expansion in six construction phases includes a seven-span bridge built in 1969. The projectĭue to the high volume of traffic, the A1 highway has been widened from 4 to 6 lanes. In the Lower Saxony BIM pilot project "Highway A1: Replacement of the bridge over the Hase and the Stichkanal" near Osnabrück, the modeling software was replaced by Allplan Bridge in the middle of the project. As part of the efforts of the federal and state governments to promote digital design and construction, a large number of infrastructure projects are currently underway and the foundations for BIM standards are being developed – including the right software.